The project included preparation for the replacement of the watermain to the Old Town.

Wire sawing on the quay-side (pictured), was completed in sections where the concrete wall was wire sawed into sections which were then lifted away and transported.

All wire sawing in this project was carried out with our speed-cut machine (pictured).